8 Publications
2007
Determination of batch size at a bottleneck machine in manufacturing systems
Koo, Pyung-HoiBulfin, Robert L and Koh, Shie-Gheun
International Journal of Production Research, vol. 45, (no. 5), pp. 1215, Mar 2007. | Journal Article
 
Minimizing the weighted number of tardy jobs on a single machine with release dates
M'hallah, Rym A and Bulfin, Robert L
European Journal of Operational Research, vol. 176, (no. 2), pp. 727, Jan 16, 2007. | Journal Article
2003
Minimizing the weighted number of tardy jobs on a single machine
M'hallah, Rym A and Bulfin, Robert L
European Journal of Operational Research, vol. 145, (no. 1), pp. 45-56, Feb 16, 2003. | Journal Article
 
Minimizing the weighted number of tardy jobs on a two-machine flow shop
Bulfin, Robert L and M'hallah, Rym A
Computers & Operations Research, vol. 30, (no. 12), pp. 1887-1900, Oct 2003. | Journal Article
1997
Production: Planning, Control and Integration
Sipper, D. and Bulfin, R.L. and Bulfin, Robert L
(pp. 630). 1997
1982
Minimizing the weighted number of tardy jobs.
Villarreal, F. J and Bulfin, Robert L
1982 Annl. Indust. Engineering Conf ; New Orleans; LA; 23-27 May 1982. 1982. | Conference Proceeding
 
Minimizing the weighted number of tardy jobs.
Villarreal, FJ and Bulfin, Robert L
pp. 459-462, 1982. | Journal Article
1975
THE MAN-MACHINE TASK ALLOCATION PROBLEM WITH SEQUENCING CONSIDERATIONS (Dissertation)
Bulfin, Robert L (1975).